SWMS GENERATOR

SWMS Generator

SafeForm Pro's SWMS Generator writes a Safe Work Method Statement tailored to your task, high-risk activity and country in about 30 seconds. Every SWMS references the relevant WHS, HSE, OSHA or Canadian OHS clauses, includes hazard identification with a risk matrix, hierarchy-of-controls treatments and wet-ink signature blocks for the SWMS supervisor and workers.

No credit card · 30-second setup · Cancel anytime

One subscription unlocks the full SafeForm Pro library — JSEA, SWMS, Take 5, SOP, Toolbox, Confined Space, Heights, Vehicle Pre-Start, HRA, Incident & SDS. Not just the SWMS. See all forms →

Why teams pick SafeForm Pro

Built for high-risk construction work

Excavation, working at heights, live electrical, demolition, confined spaces, mobile plant — the SWMS format matches what principal contractors expect on site.

Jurisdiction-aware clauses

Automatically cites WHS Regulation 291 in Australia, CDM 2015 in the UK, or the OSHA 1926 subpart that applies in the US.

Print-ready, branded PDFs

One-click PDF export with your logo, company details and unique SWMS reference number stamped on every page.

How the SWMS Generator works

  1. 1

    Pick the form type and your country so the document cites the right regulator.

  2. 2

    Describe the task in plain language — SafeForm Pro handles the structure.

  3. 3

    Review the draft, add your company logo and reference number, then print or export a PDF.

  4. 4

    Get wet signatures on site — the form includes a validity notice enforcing wet-ink sign-off.

Built for

  • Tier 1 & Tier 2 construction contractors
  • Civil, excavation and roadworks crews
  • Trades: electrical, plumbing, roofing, scaffolding
  • Demolition and asbestos removal
  • Mobile plant and crane operators

Jurisdiction-aware

  • Australia — Safe Work Australia / WHS Act 2011 & Regulations
  • New Zealand — Health and Safety at Work Act 2015 (HSWA)
  • United Kingdom — HSE / Management of H&S at Work Regs 1999, CDM 2015
  • United States — OSHA 29 CFR 1910 & 1926
  • Canada — Canada Labour Code Part II + provincial OHS

Frequently asked questions

Is an AI-generated SWMS legally compliant?

SafeForm Pro produces a structured SWMS aligned with the regulator's expected format. Under WHS law (and equivalents in other jurisdictions) the PCBU is responsible for reviewing every SWMS with the workers doing the task and signing it in wet ink before work starts. Our SWMS includes a validity notice enforcing that.

What high-risk construction work does it cover?

All 18 high-risk construction work (HRCW) categories under WHS Regulation 291, plus common UK CDM 2015 and OSHA 1926 activities.

Can I edit the SWMS after it's generated?

Yes. Every field is editable before you print, and you can regenerate sections with more detail if the task is unusual.

Ready to generate your first SWMS?

Start free — you'll have a printable, branded document in about 30 seconds. And every other SafeForm Pro template is included.